JACO CDM works on the global issues of the earth and human beings such as GHG emissions reduction and energy saving.
JACO CDMJACO
News

2012/2/20:

The PDD of "Ta Co hydroelectric power plant"is open for public comments from 21 Feb. 2012 to 21 Mar. 2012Closed

2012/2/3:

The PDDs of "Jinghong Mengsong Hydropower Project"and "Yunnan Yingjiang Sashuihe Erji and Funing Qinghuadong Bundled Small Hydropower Project"are open for public comments from 3 Feb., 2012 to 3 Mar., 2012Closed

2011/12/27:

The PDD of "Yunnan Honghe Luxi County Yongsan Wind Power Project" is open for public comments from 27 Dec., 2011 to 25 Jan., 2012Closed

2011/11/25:

The PDD of "Zhejiang Ruian MSW Incineration for Power Generation Project" is open for public comments from 26 Nov. to 25 Dec., 2011 and the PDDs of "Hebei Cangzhou MSW Incineration Project"and "Hebei Lingda MSW Incineration Project" are open for public comments from 23 Nov. to 22 Dec., 2011Closed

2011/11/21:

The PDDs of "Yunnan Lincang Nanpeng River Dayakou Hydropower Project"and "Guangxi Liuzhou Luzhai County Luoqingjiang Xifan Hydropower Project" are open for public comments from 22 Nov., 2011 to 21 Dec., 2011Closed

2011/9/22:

The PDDs of "Yuhuan MSW Incineration for Power Project"and "Yongkang MSW Incineration for Power project" are open for public comments from 23 Sep., 2011 to 22 Oct., 2011Closed

2011/9/15:

The PDD of "Green Building at Dehradun" is open for public comments from 15 Sep., 2011 to 14 Oct., 2011Closed

2011/8/18:

The PDDs of "Green Building at Mumbai"and "Energy Efficiency Green Building Project at Mumbai by ONGC Limited are open for public comments from 18 Aug., 2011 to 16 Sep., 2011Closed

2011/7/7:

"Hubei Duhe Pankou Hydropower Plant"is open for public comments from 08 Jul., 2011 to 06 Aug., 2011Closed

2011/7/1:

"Yunnan Baoshan Dengke Hydropower Project"is open for public comments from 01 to 30 Jul., 2011 and "Linhai MSW Incineration for Power Project" is open for public comments from 02 to 31 Jul., 2011Closed

2011/6/24:

"Communitiy-based Reforestation on Degraded Lands in East Lombok" is open for public comments from 25 Jun., 2011 to 24 Jul., 2011Closed

2011/2/1:

The PDD of "Huangshui Huanghui Hydropower Project" in Gansu province, China is open for public comments from 01 Feb., 2011 to 02 Mar., 2011 Closed

2010/12/10:

The PDD of "Farm Household Biogass Project Contributing to Rural Development in Can Tho City" in Viet Nam is open for public comments from 11 Dec., 2010 to 9 Jan., 2011 Closed

2010/07/16:

The PDD of "Carbon Sequestration through Reforestation in the Bolivian Tropics by Smallholders of gFSCIPAY (La Federacion Sindical de Comunidades Interculturales Productores Agropecuarios de Yapacani)hProject" is open for public comments from 16 Jul., 2010 to 14 Aug., 2010 Closed

2010/04/16:

The PDD of "Small-scale and low-income community-based mangrove afforestation project on tidal flats of three small islands around Batam City, Riau Islands Province, Republic of Indonesia" is open for public comments from 16 Apr., 2010 to 15 May, 2010 Closed

2010/03/26:

The PDDs of "Gansu Wuwei 23MW Zamusi Hydropower Project""Gansu Taolai River 52.8MW Dongshuixia Hydropower Project" is open for public comments from 27 Mar., 2010 to 25 Apr., 2010Closed

2010/02/25:

The PDD of "Jingshi Hydropower Project, Huili County, Sichuan Province" is open for public comments from 26 Feb., 2010 to 27 Mar., 2010Closed

2010/01/08:

The PDD of "Yunnan Sayutuo 60MW Hydro Power Project" is open for public comments from 08 Jan., 2010 to 06 Feb., 2010 Closed

2009/12/09:

The PDDs of"12.82 MW Bundled Small Hydropower Project in Qiandongnan Autonomous Region, Guizhou Province, P. R. China" and "11.4 MW Bundled Small Hydropower Project in Shanjunyan and Liaoli, Guizhou Province, P. R. China" are open for public comments from 09 Dec., 2009 to 07 Jan., 2010 Closed

2009/10/06:

The PDDs of "Gansu Yongjing 24.9MW Fuchuan Hydropower Project"and "Shuanghe Second Small Hydropower Project in Jilin Province" are open for public comments from 06 Oct., 2009 to 04 Nov., 2009 Closed

2009/09/10:

"7.5 MW Bundled Small Hydropower Project in Qiandongnan Autonomous Region, Guizhou Province, P.R. China (Ref.No.2359)" and "Uganda Nile Basin Reforestation Project No.3(Ref.No.1578)" have been registered with UNFCCC. (Registration date: 21/08/2009)

2009/08/05:

Shaanxi Provincial Yang County Kafang 12 MW Small-scale Hydro Power Project(China, Ref.No.2498) has been registered with UNFCCC. (Registration date: 29/07/2009)

2009/07/14:

The PDDs of"Wutuhe 25MW First-level Hydropower Project in Guizhou Province China", "Changzhai 15MW Hydro Power Project in Guizhou Province, China", "Liuzhi 3.2 MW Hydro Power Project in Guizhou Province, China", "Nongguan 2.0 MW Hydro Power Project in Guizhou Province, China" are open for public comments from 14 Jul., 2009 to 12 Aug., 2009. Closed

2009/06/16:

"CARBON SEQUESTRATION THROUGH REFORESTATION IN THE BOLIVIAN TROPICS BY SMALLHOLDERS OF gThe Federacion de Comunidades Agropecuarias de Rurrenabaque (FECAR)h(Ref.No.2510)" has been registered with UNFCCC. (Registration date: 11/06/2009)

2009/05/15:

"Cao Phong Reforestation Project (Viet Nam, Ref.No.2363)" has been registered with UNFCCC. (Registration date: 28/04/2009)

2009/05/12:

The PDDs of "Aberdare Range/ Mt. Kenya Small Scale Reforestation Init iative (7 projects)" are open for public comments from 12 May, 2009 to 10 June, 2009.Closed

2009/03/19:

The PDD of "Guangxi Baise Dongsun Hydropower Project"is open for public comments from 20 March, 2009 to 18 April, 2009.Closed

2009/01/20:

The PDDs of "China Fujian Jianyang Huangtangjia Hydropower Project", "China Fujian Jianyang Huilong Hydropower Project", "China Fujian Shaowu Jintang Hydropower Project", "China Fujian Shaowu Jinwei Hydropower Project", "China Fujian Pucheng Taipingqiao Hydropower Project" are open for public comments from 20 Jan., 2009 to 18 Feb., 2009Closed

2008/11/21:

The PDDs of"Tao River Lianlu Cascade I & II Hydropower Project in Gansu Province, China" are open for public comments from Nov.22, 2008 to Dec.21, 2008Closed

2008/10/24:

The PDDs of"Uganda Nile Basin Reforestation Project (No2,4,5)" are open for public comments from Oct.24, 2008 to Nov.22, 2008Closed

2008/10/17:

The PDD of "Uganda Nile Basin Reforestation Project (No1)"is open for public comments from Oct.18, 2008 to Nov.16, 2008Closed

2008/10/16:

The PDD of "Humbo Ethiopia Assisted Natural Regeneration Project"is open for public comments from Oct.17, 2008 to Nov.30, 2008.Closed

2008/09/30:

The PDD of "China Qinghai 42MW Jiangyuan hydropower project"is open for public comments from Oct.01, 2008 to Oct.30, 2008. Closed

2008/09/01:

The PDD of"Zafarana KfW IV Wind Farm Project, Arab Republic of Egypt"is open for public comments from Sep. 02, 2008 to Oct. 01, 2008. Closed

2008/08/21:

The PDDs of "Bundled Small Hydropower Projects in Guizhou Province, P.R. China" are open for public comments from Aug. 22, 2008 to Sep. 20, 2008. Closed

2008/08/08:

The PDDs of "Bolivia Small-scale Reforestation Project (FECAR)"and "Vietnam Small-scale Reforestation Project"are open for public comments from Aug. 9, 2008 to Sep. 7, 2008. Closed

2008/08/04:

JACO CDM has been accredited as a provisional DOE for validation function of sectoral scope 14, "Afforestation/reforestation".

2008/07/17:

CERs have been issued for "Xiaogushan Hydropower Project"on July 17, 2008.

2008/06/13:

CERs have been issued for "Youngduk Wind Park Project"on June 13, 2008.

2008/05/20:

The PDD of CDM Project"Shaanxi Provincial Yang County Kafang 12 MW Small-scale Hydro Power Project" is open for public comments from 21 May 2008 to 19 June 2008.Closed

2008/05/06:

CERs have been issued for "Gangwon Wind Park Project"on April 30, 2008.

2007/12/01:

The PDDs of CDM projects "Bundled Small Hydropower Projects in Guizhou Province, P.R. China" are open for public comments from 01 November 2007 to 30 November 2007.Closed

2007/08/24:

CERs have been issued for "Xiaogushan Hydropower Project" in China.

2007/06/22:

"Zafarana Wind Power Plant Project in Egypt" has been registered after the validation.

2007/04/27:

CERs have been issued for "e7 Bhutan Micro Hydro Power CDM Project".

2007/04/26:

JACO CDM has been accredited as a provisional DOE for verification and certification functions for the following scopes; 1.Energy industries 2.Energy distribution 3.Energy demand

2007/03/29:

The PDD of JI Project "Kaliakra Wind Power Project (KWPP) is open for public comments from 29 March 2007 to 27 April 2007.Closed

2007/03/20:

The PDD of "Uganda Nile Basin Reforestation Project (No3)" is open for public comments from 13 February 2007 to 15 March 2007. Closed

2006/06/02:

The PDD of "Zafarana Wind Power Plant Project, Arab Republic of Egypt "is open for public comments
from 02 June 2006 to 01 July 2006. → Closed

2005/05/23:

e7 Bhutan Micro Hydro Power CDM Project was registered as CDM project by CDM Executive Board.

2005/02/23:

JACO CDM was accredited as a provisional DOE for validation function of the following "sectoral scopes".

  1. Energy industries (renewable - / non-renewable sources)
  2. Energy distribution
  3. Energy demand

2005/02/05:

JACO CDM received an indicative letter for 15 "sectoral scopes" (sectoral scope 1 to 15).

TOP


JACO
INQUIRY